The documents and fees below are copied verbatim from the district’s official catalogue (report code 83) — no eligibility conditions or application steps are added beyond what it states.
Documents needed
| # | Document name | Code |
|---|---|---|
| 1 | Copy of the applicant's national ID card | 402 |
| 2 | Reconciliation form | 723 |
| 3 | Copy of the official power of attorney where an agent acts, with the original for inspection | 1056 |
| 4 | Statement naming the companies responsible for connecting the utilities | 1989 |
| 5 | Administrative statement that the building complies with the building conditions in force in the area | 1990 |
| 6 | As-built architectural sheets certified by an engineering office where the building is under three storeys and no more than 200 m², and by a consulting office where it is larger | 1992 |
| 7 | Structural safety report certified by an engineering or consulting office, as the case may be | 1993 |
| 8 | Document, certified by the administrative authority, evidencing that the building predates Law 119 of 2008 | 1994 |
| 9 | Architectural sheet certified in accordance with the reconciliation decision | 1995 |
| 10 | Copy of the letter from the Licensing, Inspection and Follow-up Department of the Armed Forces Engineering Authority regarding the reconciliation form | 1996 |
Check the document list before visiting. Ask the responsible office about anything unclear or unavailable to you.
This service’s page from the official catalogue (PDF)

General guidance
General rules: Fitness-for-occupation certificate and utility connection for licensed buildings
These are the rules for this kind of request as stated in the law and in official and published sources — not a replacement for the district’s catalogue entry above. Details can differ for your request; check with the district before you apply.
How to apply
- 1Once the licensed works are complete, the supervising engineer issues the building's fitness-for-occupation certificate.
- 2The certificate is deposited with the planning and building-control authority together with a copy, certified by the supervising engineer, of the drawings as actually built.
- 3The administrative body issues the utility-connection letters within two weeks at most of the certificate being deposited.