Downtown DistrictAlexandria Governorate

Residents

Utility verification and connection — licences

The documents and fees below are copied verbatim from the district’s official catalogue (report code 83) — no eligibility conditions or application steps are added beyond what it states.

Fee schedule

Service fees for utility verification and connection — licences

Fee codeFee itemInitial value
2838SMS messaging service charge5.00 EGP
2939Levy for the martyrs, victims, missing and injured of military and terrorist operations5.00 EGP
1273State financial resources development levy2.00 EGP

External approvals required

  • The General Authority of the Armed Forces

This service’s page from the official catalogue (PDF)

This service’s page from the official catalogue (PDF)

General guidance

General rules: Fitness-for-occupation certificate and utility connection for licensed buildings

These are the rules for this kind of request as stated in the law and in official and published sources — not a replacement for the district’s catalogue entry above. Details can differ for your request; check with the district before you apply.

How to apply

  1. 1Once the licensed works are complete, the supervising engineer issues the building's fitness-for-occupation certificate.
  2. 2The certificate is deposited with the planning and building-control authority together with a copy, certified by the supervising engineer, of the drawings as actually built.
  3. 3The administrative body issues the utility-connection letters within two weeks at most of the certificate being deposited.
Sources (2)