The documents and fees below are copied verbatim from the district’s official catalogue (report code 83) — no eligibility conditions or application steps are added beyond what it states.
Documents needed
| # | Document name | Code |
|---|---|---|
| 1 | Copy of the applicant's national ID card | 402 |
| 2 | Copy of the official power of attorney where an agent acts, with the original for inspection | 1056 |
| 3 | Certified Civil Defence statement that fire protection measures have been reviewed | 1394 |
| 4 | Spatial changes certificate | 1667 |
| 5 | Architectural sheet (elevations, basement, ground floor, typical floors, roof) and structural sheet (grids and columns), certified by the administrative authority | 1891 |
| 6 | Reconciliation form 10 (permanent) | 1906 |
| 7 | Certified true copy of reconciliation forms 2, 3, 5 and 8 | 1972 |
Check the document list before visiting. Ask the responsible office about anything unclear or unavailable to you.
This service’s page from the official catalogue (PDF)

General guidance
General rules: Reconciliation of building violations and regularisation (Law 187/2023)
These are the rules for this kind of request as stated in the law and in official and published sources — not a replacement for the district’s catalogue entry above. Details can differ for your request; check with the district before you apply.
Conditions
- Reconciliation is possible for building violations committed before the law came into force that do not impair the building's structural safety (Art. 2).
- Restricted cases include exceeding height limits under the Civil Aviation Law, provided air navigation is not affected and the ministry responsible for civil aviation consents (Art. 2(6)).
- Reconciliation is prohibited for works impairing structural safety, building on antiquities or Nile-protection land, and changing the use of parking spaces (garages) (Art. 3).
- Applications are filed within six months of the executive regulations taking effect, extendable for periods totalling no more than three years (Art. 6).
- An application lapses six months after the filing certificate is received if the documents are not completed (Art. 6).
- Reconciliation may only be accepted once all existing unfinished facades have been painted; villages and their hamlets are exempt (Art. 9).
- Reconciliation is refused or voided on non-payment within sixty days, failure to pay two instalments, alteration of the reconciled works, or false documents (Art. 12).
