The documents and fees below are copied verbatim from the district’s official catalogue (report code 83) — no eligibility conditions or application steps are added beyond what it states.
Documents needed
| # | Document name | Code |
|---|---|---|
| 1 | Power of attorney from the partners to the applicant, or a letter of authorisation from the company | 207 |
| 2 | Copy of the national ID card | 326 |
| 3 | Survey map | 468 |
| 4 | Engineer's report on the building's fitness for operation | 632 |
| 5 | After inspection the service is completed by issuing letters to the utility departments responsible for connection | 686 |
| 6 | Certificate from a specialist consulting engineer on the site's structural suitability or the property's load capacity | 792 |
| 7 | Copy of the contract | 1492 |
| 8 | The sketch plan | 1528 |
| 9 | Level certificate | 1647 |
Check the document list before visiting. Ask the responsible office about anything unclear or unavailable to you.
This service’s page from the official catalogue (PDF)

